Technical Name DesignDevelopment of selenization furnace for CIGS solar cell
Project Operator Eterbright Solar Corporation
Project Host -
Summary
"1. Large substrate size(1220mm * 650 mm)high throughput design (60pcs per batch).
2. Remote monitoringmanagement system to avoid operating in specialty gas environment, protecting the safety of operator.
3. Using the mixture of dry adsorptionwater washing system for exhaust gas treatment, none of the hazardous gas will be detected.
4. The precision error of the specialty gas flow c
Scientific Breakthrough
-
Industrial Applicability
-
Keyword
Notes
  • Contact
other people also saw